AL WASEET CAIRO PDF

Images and Prices for Apartments for sale in Cairo, Egypt, Browse Images and Communicate with Owner Directly on Waseet. Al – Waseet, Nasr City, Cairo, 1 | Newspapers & Magazines Cairo | | eg. Al – Waseet, Maadi, Cairo, 1 | Newspapers & Magazines Cairo | |

Author: Juzahn Tunris
Country: Canada
Language: English (Spanish)
Genre: Relationship
Published (Last): 11 February 2009
Pages: 181
PDF File Size: 11.37 Mb
ePub File Size: 2.67 Mb
ISBN: 647-9-63982-945-1
Downloads: 48941
Price: Free* [*Free Regsitration Required]
Uploader: Najinn

August — Kafr Elshekh Road Desouk-Damanhour Give advice and backstop in the services processes reengineering Assist in the overall relaunch program of TE services Lead the relaunch program for the Business services x.

al-Waseet الوسيط

The project consists of six phases, namely, the diagnostic study, the strategic planning, the reorgnization, reengineering the main processes, systems development, and human csiro development. The first two stages caiiro consecutive while the other four are simultaneously implemented with the last stage to start at the outset of the project and to finish with the its completion.

The project aims at establishing a Craft Certification System to be utilized as an effective tool to train, qualify, and certify the technical workforce in the industrial community members of the FEI. The needs assessment, The presentation; selection of the crafts The development of craft certification manuals, and The identification of an international certification body. Ahmed Ali, in the capacity of senior management consultant, was wazeet to the leading and largest telecommunication company in Egypt; Mobinil with the following Responsibilities: Giving advice and backstops in HRD area.

  BROM JUAN ESBOZO DE HISTORIA UNIVERSAL MEXICO GRIJALBO PDF

Conducting more than training contact hours so far. Leading a team to design and develop the wasert training program for the district engineers. Leading a team to design and develop the management training program for the inspectors, and their supervisors. Conducting the program seminars, completing 20, training contact hours.

Design and conduct a follow-up program. Feasibility studies inside Egypt and in wasete Gulf Area. Economic feasibility study for the third and fourth stages of the Industrial City of Tenth of Ramadan.

Mohamed Sayed Tantawy – Wikipedia

Tourism Development Unit, Ministry of Tourism. Leading a team work to conduct the technical valuation and evaluation of entities to be privatized for the Egyptian Industries Holding Companies. Collecting, reviewing, and evaluating available physical and financial data including Field work e. Collection and verification including inspecting the existing fixed assts. Reviewing existing production and maintenance systems.

https //play.google.com/store/apps/details id com.awi.waseet, Cairo

Identifying the raw material, consumables, and spare parts used in the production. Establishing a management-training program for top and middle management levels with he objectives of developing needed performance improvement and managerial skills within GOSD.

  EL ATRAHASIS PDF

Leading counterpart program and management seminars.

Leading the reorganization team to implement the state-of-the-art organization change principles throughout the reorganization process. Leading the industrial flow monitoring and enforcement task team to revise the existing regulations.

Leading the Strategic Planning process. Determining the economic, environmental, and efficient operations of sludge disposal. Leading a team work to conduct the technical valuation and evaluation of entities to waeset privatized for the Egyptian Industries Holding Companies, Responsibilities included: Assisting in initiating a counterpart program.

Leading Financial Seminars to cover topics such as: Feasibility Study, Financial Planning, and Managerial economics.