ELSTER A1140 PDF

Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.

Author: Meztisho Gajar
Country: Andorra
Language: English (Spanish)
Genre: History
Published (Last): 28 November 2004
Pages: 298
PDF File Size: 6.8 Mb
ePub File Size: 1.86 Mb
ISBN: 119-4-92955-264-2
Downloads: 20322
Price: Free* [*Free Regsitration Required]
Uploader: Jusho

Recordable security features are illustrated below.

Elster A1140 User Manual

This manual is for use with 1a140 A meter and the A load profile meter only. We aim to process all orders we receive within 1 to 3 working days, however from time to time we do have an increased demand for certain products or there might be delays from the manufacturer. The only solution I can see at present is to use a second energy monitor: The indicators can be enabled or disabled from the display.

Graph Load Profile readings can be displayed as a graph.

After 3pm, please arrange with our staff before selecting a priority delivery service. An example ellster a switching program is below. It uses CTs with no problem. Meters – This is a list of meters available on the system. It also allows other parameters shown opposite to be entered.

Installation Check that there is no movement or loose parts within the meter enclosure. When you have chosen the folder: Especially when the goods are often essential to your working day. It should be simple enough to record my single phase consumption this part of the Emonpi worksrecord my generation, and derive import and export arithmetically.

  CENTRIFUGALNE PUMPE PDF

Select Compatibility on the Main Menu Bar.

System Connections 3 Element: The log records the following parameters: The port can operate at baud rates of up to Data Stream Mode meters should be set to 8, None, 1. RES files to be deleted. Select your preferred way to display the comments and click “Save settings” to activate your changes. See the list below for details a11400 meter variants.

The Elster A is also MID-approved and highly accurate so the user flster have complete confidence in all the readings whilst benefitting from the clear, 8-digit, LCD display for local access and data recording. Try ellster the period between pulses rather than counting pulses over a period of time, this will give you a faster indication of direct power measurement. The port operates at speeds of up to baud.

FREE Delivery on select products only: RS Multi-drop Mode An optional external battery that supports the reading of meter data and display facilities during power outages can be provided. This software is available from Elster Metering Systems and is described in M 3. Ensure that the chosen pulse value and pulse width leaves adequate gaps between pulses at rlster meter loads. It consists of a Page Identifier and three Check Panels.

ELSTER A Maximum Demand Meter

I’m looking to automatically monitor the energy usage on our farm, which includes a 30KW solar array. The meter stores all registration and configuration data to non-volatile memory.

  CASIPERRO DEL HAMBRE PDF

Optional Serial Data Port Fast data collection of cumulative registers, historical data and load profiling A using rlster stream mode System Connections 3 Element: Up to 40 displays can be made available for each mode of operation. You have no items in your shopping cart. Readings The A can be programmed to record up to four values elsyer any of the rising demand registers at the end of each integration period.

ELSTER A USER MANUAL Pdf Download.

Up to 32 Exclusion Dates can be programmed. This option allows unwanted. Enter text from picture: Options obey standard Windows conventions and are viewed by pointing at the right pane of the Scheme manager, then right clicking the mouse.

Appendix D – External Battery Module External Battery Module power will be removed from the meter if the ‘No button time-out’ programmable from 10 to seconds using the Power Master Unit has expired. Before installing a module or module peripheral equipment, read the Elater Warnings, Warnings, Precautions for handling electrostatic discharge sensitive devices and EMC Guidelines below. I can imagine how frustrating it can be when things don’t work as expected.

Be the first to review this product.